| BTS COMMISSIONING |
|
RN Infra Communications Pvt. Ltd. has attained significant expertise in BTS commissioning. |
| The work involves following activities:- |
|
-
Preparing the BT 3002 cable from BTS to DDF block with T 43 sockets at BTS end and T 43 Plug at DDF end.
-
Preparing the BT 3002 cable from DDF to M/W equipment with T 43 Plug at DDF end and BNC Male Connector at M/W equipment at end.
-
Pix Alarm wiring to be done with termination of alarm points on the krone DDF.
-
Termination & Testing of all external alarms on the Krone DDF.
-
NMS Cable termination as per requirement.
-
VSWR test of antennas using site master test equipment.
-
Frequency calibrations through freq counter equipment.
-
Cross connection through Far end at bypassing.
-
Power Calibration & Power measurement through Digital Power Meter.
-
Call & Sector swapping testing using Net Monitor Software by cell phone.
|
Documents |
|
|
- BTS & M/W inventory list with product serial numbers.
- Final Site Layout drawing & plan
- Site inventory list with all equipment serial numbers
|